Let the cutting begin!!

More than 1/3 of the concrete is coming out including the existing trench drain. All of this in order to install a proper sloped floor to support our tanks, a new trench drain and plumbing for tasting bar floor drains and wastewater filtration system.

Recommend
Share
Tagged in